Dark
Light
20/10/2026  
02/09/2026
1 min read

Montage Gold at C$8B Before First Pour, 349koz and $998 AISC, Is Koné Already Priced to Perfection?

In this deep dive series, we explore Montage Gold (TSX: MAU), a miner that is no longer a hidden developer. Koné in Côte d’Ivoire is under construction, with first gold targeted late Q4 2026. The 2024 study showed 3.57 million ounces over 16 years and $998 AISC. Resources have since grown, but the stock already prices a clean build. We break down the mine plan, satellites, share structure, management, and whether execution can still justify this valuation. Not financial advice. Do your own research. Watch the full video to learn more.

Presentation slides:

Full written analysis at the original article here: 

https://www.rocketeller.com/montage-gold-building-west-africas-next-300koz-producer-first-pour-late-2026-5-88moz-resource/

RT

We spent more than a decade as a forex trader before discovering a simpler truth: macro thinking beats trading noise. That the exact date we became a value investor. Our investing framework focuses on fundamentals, cycles, ratio charts, and technical timing. If you want to understand markets without the Wall Street jargon, follow along.

Leave a Reply

Your email address will not be published.

Previous Story

Billions Spent Looking for Copper. But We Are Finding Less of It

Next Story

Tristar Gold: 1.4Moz Reserves, 40% IRR, $92M Stock, $603M NPV. One Court Ruling in the Way.

Latest from Blog

Go toTop

Don't Miss

Amex Gold: 12.1 g/t Reserves, 0.5-Year Payback, and the Mine Is Already Being Built Underground

Amex Gold Mining Inc. TSXV: AMX, OTCQX: AMXEF Introduction Amex

XXIX Metal: Canada Copper Junior With 697,000 oz Gold Credit and a C$617M Problem

In this episode of deep dive, we breakdown XXIX Metal